New Four Ship-to-Shore (STS) Container Cranes

As part of our massive investment program, which we are carrying out in line with our vision for next-generation port operations, four Ship-to-Shore (STS) container cranes, now fully manufactured, are being loaded onto a ship at the DHHI facilities and are on their way to Turkey.

Scheduled to begin operations at our port in August, these high-capacity cranes will be a key component of our faster, safer, and more efficient operational infrastructure.

At Safiport, we continue to support our growing operational volume with robust infrastructure investments and contribute to our country’s logistics capabilities.

We wish our new STS cranes every success at our port and in the industry.

As part of our massive investment program, which we are carrying out in line with our vision for next-generation port operations, four Ship-to-Shore (STS) container cranes, now fully manufactured, are being loaded onto a ship at the DHHI facilities and are on their way to Turkey.
×

Müşteri İlişkileri

Ahmet POLAT Çevrim İçi
41252

Müşteri İlişkileri

Berkay Sıtkı KÜÇÜK Çevrim İçi
41253

Müşteri İlişkileri

Evren AYDIN Çevrim İçi
41254

Müşteri İlişkileri

Celal MALKOÇ Çevrim İçi
41255

Müşteri İlişkileri

Barış ŞAHİN Çevrim İçi
41256

Müşteri İlişkileri

Emre GÜNDAĞ Çevrim İçi
41258

Müşteri İlişkileri

Erdem ÇUBUK Çevrim İçi
41259

Müşteri İlişkileri

Şeyma ALKAN Çevrim İçi
41261

Müşteri İlişkileri

Zeynep YELEKÇİ Çevrim İçi
41262

Müşteri İlişkileri

Yunus TOPTAŞ Çevrim İçi
41263

Müşteri İlişkileri

İdil Tutku YILMAZ Çevrim İçi
41264

Müşteri İlişkileri

Betül TIRAŞ Çevrim İçi
41265

Müşteri İlişkileri

Ahmet KOCAMAN Çevrim İçi
41266
×